The following Costing documents (v1.0 dated 28/09/2009) for Building and Civil Engineering Works (under Pillar 3: Standard Forms for Cost Planning & Cost Control) have been updated to reflect the current standard rate of VAT in the Executive Summary (sheet 2 of the spreadsheets).
- CO1.1a Costing Document (Building Works)
- CO2.1a Costing Document (Civil Engineering Works) – Roads
- CO2.2a Costing Document (Civil Engineering Works) – Water Services
- CO2.3a Costing Document (Civil Engineering Works) – Marine