Main menu

Skip to primary content
Skip to secondary content
  • Leathanach baile
  • Nuacht
  • SFF (BIM)
  • Inbhuanaitheacht
  • Naisc Usáideacha
  • Eolais Fúinn
  • Déan Teagmháil Linn

(English) Model Form Flowchart

Clicking on the yes/no options to the following questions will assist us in directing you to the appropriate letter to notify Candidates/Tenderers at different stages of the procurement process

Is the Procurement Procedure for a Works Contract ?        No

Is the Procurement Procedure for a works-related service contract?       Yes       No

(for a definition of a construction-related Services Contract move cursor hereinfoWorks-related service contracts cover the broad range of professional consultants required to successfully deliver a construction project. These would typically include the services of an architect, engineer* and quantity surveyor. In addition to these core services, specialists such as urban planners, fire safety consultants, Project Supervisors, traffic management consultants and archaeologists, where engaged as part of the development of a project’s design, are classed as works-related services. *Engineering services cover a wide range of specialist areas and the extent to which they are required will depend on the nature and complexity of the project. The range of specialist areas includes structural, civil, building services, mechanical, electrical, geotechnical, acoustic, fire safety, etc. )

  • Frámaíocht Bhainistíochta d’Oibreacha Caipitiúla
    • Scéim um Chódú Doiciméad
  • Cuid 1: Conradh Oibreacha Poiblí
    • Conarthaí
    • Samhail-Fhoirmeacha
    • Cuirí Tairisceana (Oibreacha)
    • Tairiscint & Sceideal (Oibreacha)
    • Gnóthais Nasctha Údaraithe
    • Eadráin Rialacha
    • Imeachtaí Aimsir
    • Nóta Faisnéise GDPR
  • Cuid 2: Coinníollacha Conartha
    • Bunchoinníollacha Coinníoll Chonartha
    • Samhail-Fhoirmeacha
    • Cuirí Tairsceana (Seirbhísí)
    • Tairiscint agus Sceideal (Seirbhísí)
    • Eadráin Rialacha
    • Nóta Faisnéise GDPR
  • Cuid 3: Costas Pleanáil/Stúradh agus Breithmheasa
    • BunFhoirmeacha do Rialúcostais agus óiriúnacht Pleanála
    • Ceistneoirí Breithmheasa
    • Leabhair oibre maidir le hAthrú Praghsanna
  • Cuid 4: Nótaí Treorach agus Gluais
    • Nótaí Treorach
    • Treoir ar Thairseacha Soláthair Phoiblí agus Nósanna Imeachta Soláthair
    • Creat-Chomhaontú Slabhra an tSoláthair
    • CWMF Covid19 Guidance and Templates
  • Archive
    • Archive of CWMF News Articles
    • Pillar 1 – Public Works Contracts Document Archive
      • Archived: Pillar 1 – Contracts
      • Archived: Pillar 1 – Model Forms
      • Archived: Pillar 1 – Instructions to Tenderers (Works)
      • Archived: Pillar 1 – Forms of Tender and Schedules (Works)
      • Archived: Pillar 1 – Arbitration Rules
      • Archived: Pillar 1 – Weather Events
    • Pillar 2 – Conditions of Engagement Document Archive
      • Archived: Pillar 2 – Standard Conditions of Engagement
      • Archived – Pillar 2 – Model Forms
      • Archived: Pillar 2 – Instructions to Tenderers (Services)
      • Archived: Pillar 2 – Forms of Tender and Schedules (Services)
      • Archived: Pillar 2 – Arbitration Rules
    • Pillar 3 – Cost Planning/Control and Suitability Assessment Document Archive
      • Archived: Pillar 3 – Standard Forms for Cost Planning & Cost Control
      • Archived: Pillar 3 – Standard Assessment Questionnaires for Service Providers
      • Archived: Pillar 3 – Suitability Assessment Questionnaires for Works Contractors
    • Pillar 4 – Guidance Notes and Glossary Archive
      • Archived: Pillar 4 – Guidance Notes
      • Archived – Pillar 4: Inflation/ Supply Chain Delay Co-operation Framework

Subscribe

Plaza Míseach, 50-58 Sráid Bhagóid Íochtarach, Baile Átha Cliath 2, D02 XW14

Déan Teagmháil Linn: construction@per.gov.ie.

Ráiteas Príobháideachais

Inrochtaineacht

  • English
  • Gaeilge