Sorry, this entry is only available in Béarla Meiriceánach
Category: New Archives
(English) 27 June 2018 – Publication of amended PW-CF 1 to 5 inclusive, MF 1.13, and Guidance Note 2.3
(English) 6 June 2018 – Publication of amended forms FTS1 to FTS5 inclusive, FTS 13, ITT-W1, ITT-W1a, ITT-W2 and ITT-W8
(English) 24 May 2018 – Amendments to the Capital Works Management Framework (CWMF) to reflect the introduction of Sectoral Employment Orders in the construction sector.
(English) 20 December 2017 – Revision of Public Procurement Directives’ thresholds with effect from 1 January 2018:
(English) 21 November 2017 – Government Strategy to Increase use of Digital Technology in Key Public Works Projects Launched
16 August 2017 – Method of Measurement for Road Works
The term ‘Method of Measurement for Road Works’ is included in a number of the CWMF procurement templates and guidance material. It refers to the method of measurement that is required to be used on schemes funded by Transport Infrastructure Ireland (TII). It has been brought to our attention that the title of this document has been changed. The revised title is now Requirements for Measuring and Pricing (RMP).
From today the following templates have been updated to include the revised reference where the Bill of Quantities or Pricing Document requires definition:
Suitability Assessment Questionnaires:
QW1 (v2.0)
QW4 (v1.0)
Forms of Tender and Schedules:
FTS3 (v2.2)
FTS5 (v2.2)
FTS13 (v1.0)
Instead of ‘Method of Measurement for Road Works’ the reference is now to ‘TII’s Requirements for Measuring and Pricing (RMP).’
Guidance Note GN 1.5.3 (v1.2) has also been amended to update this reference.
The revision references for these documents have not been changed since these changes are not considered material.
23 June 2017 – Publication of Submissions received on the position paper ‘A Public Sector BIM Adoption Strategy’
Further to news item dated 15 March 2017 – Commencement of a consultation process on the adoption of Building Information Modelling (BIM) on public works projects, the submissions received as part of the consultation process on the position paper ‘A Public Sector BIM Adoption Strategy’ are available to download here.
All respondents submitted a completed questionnaire whereas some included supplementary submissions. Both are published where applicable.
23 May 2017 – Concessions Directive (2014/23/EU) signed into Irish law – SI 203 of 2017 (18th May 2017)
The Minister for Public Expenditure and Reform signed the Concessions Directive (2014/23/EU) into Irish law on 18th May 2017 (SI 203 of 2017 refers). A link to the press release is available here.
25 April 2017 – Short Public Works Contract PW-CF6 v1.10
Amendments were made to the Public Works Contracts including the Short Public Works Contract (PW-CF6) in June 2016 to reflect the provisions of the Construction Contracts Act (News item 28 June 2016 refers).
A new clause 4.3 was added to PW-CF6 v1.9 (dated 30 June 2016) detailing the procedure for processing final statements and payment following Substantial Completion certification. All remaining sub clauses within clause 4 were renumbered accordingly. However there was a reference in (the re-numbered) clause 4.6, which had not been updated at that time and this has now been corrected in PW-CF6 v1.10 (dated 25 April 2017).