How to use the archive
- Click on the (More Information) link for the archived versions of each Guidance Note (GN).
- Click on the link in the first column for a specific version/date of the document.
- Details of the relevant changes are available by clicking on the corresponding ‘Changes’ link (second column)
GN 1.0 – Introduction to the Capital Works Management Framework
GN 1.0 – v1.0 28/07/09 | Changed 21/01/19 |
GN 1.0 – 30/04/07 | Changes 28/07/09 |
GN 1.1.2 – Professional Indemnity Insurance Application in the Capital Works Management Framework
GN 1.3 – Budget Development
GN 1.4 – Procurement and Contract Strategy for Public Works Contracts
GN 1.4 – v1.1 17/01/12 | GN 1.4 Changes 04/09/18 |
GN 1.4 – v1.0 10/05/11 | Changes 17/01/12 |
GN 1.4 – v1.0 28/01/11 | GN 1.4 Changes 10/05/11 |
GN 1.4 – v1.0 28/07/09 | GN 1.4 Changes 28/01/11 |
GN 1.5 – Public Works Contract
GN 1.5.1 – Public Works Contracts: Managing the Pre-Contract Phase
GN 1.5.2 – Public Works Contracts: Price Variation Clauses
GN 1.5.2 – v1.1 26/08/22 | |
GN 1.5.2 – v1.0 22/01/16 | Changes 26/08/22 |
GN 1.5.3 – Public Works Contracts: The Pricing Document
GN 1.5.3 – v1.3 29/07/21 | Changes 27/09/22 – Typo Section 1.3 |
GN 1.5.3 – v1.2 28/06/16 | Changes 29/07/21 |
GN 1.5.3 – v1.1 21/03/16 | Changes 28/06/16 |
GN 1.5.3 – v1.0 22/01/16 | GN 1.5.3 Changes 21/03/16 |
GN 1.6 – Procurement Process for Consultancy Services (Technical)
GN 1.6.1 – Suitability Assessment of Construction Services Providers, Restricted Procedure
GN 1.6.1 – v1.0 23/03/11 | Changes 17/01/12 |
GN 1.6.1 – v1.0 28/01/11 | Changes 23/03/11 |
GN 1.6.1 – v1.0 28/07/09 | Changes 28/01/11 |
GN 1.6.2 – Suitability Assessment of Construction Service Providers, Open Procedure
GN 1.6.2 – v1.1 23/03/11 | Changes 17/01/12 |
GN 1.6.2 – v1.0 28/01/11 | GN 1.6.2 Changes 23/03/11 |
GN 1.6.2 – v1.0 28/07/09 | GN 1.6.2 Changes 28/01/11 |
GN 1.6.3 – Suitability Assessment of Construction Service Providers – Minimum Standards for Suitability Criteria
GN 1.6.4 – Liability Caps Application in the Standard Conditions of Engagement COE1 and COE2
GN 1.7 – Standard Conditions of Engagement for Consultancy Services (Technical) Guidance Note and Sample Schedules
GN 2.2 – Planning and Control of Capital Costs
GN 2.3 – Procurement Process for Works Contractors
GN 2.3.1 – Suitability Assessment of Works Contractors, Restricted Procedure
GN 2.3.1 – v1.1 17/01/12 | |
GN 2.3.1 – v1.0 28/01/11 | Changes 17/01/12 |
GN 2.3.1 – v1.0 28/07/09 | GN 2.3.1 Changes 28/01/11 |
GN 2.3.1.2 – Suitability Criteria for Contractors, Submission of Evidence & Procurement Thresholds (Open, Restricted Procedure)
This guidance note is withdrawn from the suite of guidance notes as it has been superseded by amended procurement documents issued in August 2023
GN 2.3.1.2.1 – Reconciliation of Appendices in GN 2.3.1.2 and QW1, QW2 and QW3 (Open, Restricted Procedure)
This guidance note is withdrawn from the suite of guidance notes as it has been superseded by amended procurement documents issued in August 2023
GN 2.3.1.2.1 – v1.0 04/09/17 | |
GN 2.3.1.2.1 – v1.0 07/09/10 | GN 2.3.1.2.1 Changes 30/09/10 |
GN 2.3.1.3 – Minimum Standards for Suitability Works Contractor Criteria (Open, Restricted Procedure)
GN 2.3.2 – Suitability Assessment of Works Contractors, Open Procedure
GN 2.3.2 – v1.1 17/01/12 | |
GN 2.3.2 – v1.0 28/01/11 | Changes 17/01/12 |
GN 2.3.2 – v1.0 28/07/09 | GN 2.3.2 Changes 28/01/11 |
GN 2.3.3 – Specialists and the Public Works Contracts
GN 2.3.4 – Tender Price Indexation – Calculation, Notification and Application
GN 2.3.5 – Liability Caps Application in the Public Works Contract
GN 3.1 – Implementation Process
GN 3.1.1 – Dispute Resolution