Contracts – (PW-CF) |
PW-C |
PWC Training Manual – 19 Errata to Contract |
17 Feb 2007 |
Changes |
PW-CF |
Instructions for Public Works Contracts |
04 Nov 2009 |
Changes |
PW-CF |
Instructions for Public Works Contracts |
01 Aug 2008 |
Changes |
PW-CF1 |
SCHEDULE |
13 Jan 2014 |
Changes |
PW-CF1 |
SCHEDULE |
01 May 2013 |
Changes |
PW-CF1 |
SCHEDULE |
28 Jul 2011 |
Changes |
PW-CF1 |
SCHEDULE |
30 Mar 2010 |
Changes |
PW-CF1 |
SCHEDULE |
22 Dec 2009 |
Changes |
PW-CF1 |
SCHEDULE |
04 Nov 2009 |
Changes |
PW-CF2 |
SCHEDULE |
13 Jan 2014 |
Changes |
PW-CF2 |
SCHEDULE |
01 May 2013 |
Changes |
PW-CF2 |
SCHEDULE |
28 Jul 2011 |
Changes |
PW-CF2 |
SCHEDULE |
30 Mar 2010 |
Changes |
PW-CF2 |
SCHEDULE |
22 Dec 2009 |
Changes |
PW-CF2 |
SCHEDULE |
04 Nov 2009 |
Changes |
PW-CF3 |
SCHEDULE |
13 Jan 2014 |
Changes |
PW-CF3 |
SCHEDULE |
01 May 2013 |
Changes |
PW-CF3 |
SCHEDULE |
07 Oct 2011 |
Changes |
PW-CF3 |
SCHEDULE |
28 Jul 2011 |
Changes |
PW-CF3 |
SCHEDULE |
30 Mar 2010 |
Changes |
PW-CF3 |
SCHEDULE |
22 Dec 2009 |
Changes |
PW-CF3 |
SCHEDULE |
04 Nov 2009 |
Changes |
PW-CF4 |
SCHEDULE |
13 Jan 2014 |
Changes |
PW-CF4 |
SCHEDULE |
01 May 2013 |
Changes |
PW-CF4 |
SCHEDULE |
07 Oct 2011 |
Changes |
PW-CF4 |
SCHEDULE |
28 Jul 2011 |
Changes |
PW-CF4 |
SCHEDULE |
30 Mar 2010 |
Changes |
PW-CF4 |
SCHEDULE |
22 Dec 2009 |
Changes |
PW-CF4 |
SCHEDULE |
04 Nov 2009 |
Changes |
PW-CF5 |
SCHEDULE |
13 Jan 2014 |
Changes |
PW-CF5 |
SCHEDULE |
18 July 2013 |
Changes |
PW-CF5 |
SCHEDULE |
01 May 2013 |
Changes |
PW-CF5 |
SCHEDULE |
08 Aug 2011 |
Changes |
PW-CF5 |
SCHEDULE |
28 Jul 2011 |
Changes |
PW-CF5 |
SCHEDULE |
30 Mar 2010 |
Changes |
PW-CF5 |
SCHEDULE |
22 Dec 2009 |
Changes |
PW-CF5 |
SCHEDULE |
04 Nov 2009 |
Changes |
PW-CF6 |
SCHEDULE |
25 Mar 2011 |
Changes |
PW-CF7 |
SCHEDULE |
01 May 2013 |
Changes |
PW-CF7 |
SCHEDULE |
03 Oct 2011 |
Changes |
PW-CF7 |
SCHEDULE |
25 Mar 2011 |
Changes |
PW-CF8 |
SCHEDULE |
25 Mar 2011 |
Changes |
PW-CF10 |
SCHEDULE |
29 Aug 2011 |
Changes |
PW-CF11 |
SCHEDULE |
24 Nov 2014 |
Changes |
PW-CF1 |
Building Works designed by the Employer |
22 Jan 2016 |
PW-CF1 |
Building Works designed by the Employer |
27 Jan 2014 |
Changes |
PW-CF1 |
Building Works designed by the Employer |
04 Sept 2012 |
Changes |
PW-CF1 |
Building Works designed by the Employer |
28 July 2011 |
Changes |
PW-CF1 |
Building Works designed by the Employer |
30 Mar 2010 |
Changes |
PW-CF1 |
Building Works designed by the Employer |
04 Nov 2009 |
Changes |
PW-CF1 |
Building Works Designed by the Employer |
28 Jul 2009 |
Changes |
PW-CF1 |
Building Works Designed by the Employer |
14 Oct 2008 |
Changes |
PW-CF1 |
Building Works designed by the Employer |
19 Feb 2007 |
Changes |
PW-CF2 |
Building Works designed by the Contractor |
27 Jan 2014 |
Changes |
PW-CF2 |
Building Works designed by the Contractor |
28 July 2011 |
Changes |
PW-CF2 |
Building Works designed by the Contractor |
30 Mar 2010 |
Changes |
PW-CF2 |
Building Works designed by the Contractor |
04 Nov 2009 |
Changes |
PW-CF2 |
Building Works Designed by the contractor |
28 Jul 2009 |
Changes |
PW-CF2 |
Building Works Designed by the contractor |
14 Oct 2008 |
Changes |
PW-CF2 |
Building Works designed by the Contractor |
19 Feb 2007 |
Changes |
PW-CF3 |
Civil Engineering Works designed by the Employer |
27 Jan 2014 |
Changes |
PW-CF3 |
Civil Engineering Works designed by the Employer |
28 July 2011 |
Changes |
PW-CF3 |
Civil Engineering Works designed by the Employer |
30 Mar 2010 |
Changes |
PW-CF3 |
Civil Engineering Works designed by the Employer |
04 Nov 2009 |
Changes |
PW-CF3 |
Civil Engineering Work designed by the Employer |
28 Jul 2009 |
Changes |
PW-CF3 |
Civil Engineering Work designed by the Employer |
14 Oct 2008 |
Changes |
PW-CF3 |
Civil Engineering Works designed by the Employer |
19 Feb 2007 |
Changes |
PW-CF4 |
Civil Engineering Work designed by the Contractor |
27 Jan 2014 |
Changes |
PW-CF4 |
Civil Engineering Work designed by the Contractor |
28 July 2011 |
Changes |
PW-CF4 |
Civil Engineering Work designed by the Contractor |
30 Mar 2010 |
Changes |
PW-CF4 |
Civil Engineering Works designed by the Contractor |
04 Nov 2009 |
Changes |
PW-CF4 |
Civil Engineering Work designed by the Contractor |
28 Jul 2009 |
Changes |
PW-CF4 |
Civil Engineering Work designed by the Contractor |
14 Oct 2008 |
Changes |
PW-CF4 |
Civil Engineering Works designed by the Contractor (web) |
03 Aug 2007 |
Changes |
PW-CF4 |
Civil Engineering Works designed by the Contractor |
19 Feb 2007 |
Changes |
PW-CF5 |
Minor Building & Civil Engineering works |
27 Jan 2014 |
Changes |
PW-CF5 |
Minor Building & Civil Engineering works |
28 July 2011 |
Changes |
PW-CF5 |
Minor Building & Civil Engineering works |
30 Mar 2010 |
Changes |
PW-CF5 |
Minor Building & Civil Engineering works |
04 Nov 2009 |
Changes |
PW-CF5 |
Minor Building and Civil Engineering Works |
28 Jul 2009 |
Changes |
PW-CF5 |
Minor Building and Civil Engineering Works |
14 Oct 2008 |
Changes |
PW-CF5 |
Minor Building & Civil Engineering works (web) |
03 Aug 2007 |
Changes |
PW-CF5 |
Minor Building & Civil Engineering works |
19 Feb 2007 |
Changes |
PW-CF6 |
Short Public Works Contract |
27 Jan 2014 |
Changes |
PW-CF6 |
Short Public Works Contract |
08 Aug 2011 |
Changes |
PW-CF6 |
Short Public Works Contract |
04 Nov 2009 |
Changes |
PW-CF6 |
Short Public Works Contract |
04 Nov 2009 |
Changes |
PW-CF6 |
Short Public Works Contract |
28 Jul 2009 |
Changes |
PW-CF6 |
Short Public Works Contract |
30 Oct 2008 |
Changes |
PW-CF7 |
Public Works Investigation Contract |
28 Jul 2009 |
Changes |
PW-CF8 |
Public Works Short Form of Investigation Contract |
28 Jul 2009 |
Changes |
PW-CF9 |
Public Works Framework Agreement |
28 Jul 2009 |
Changes |
PW-CF10 |
Public Works Contract for Early Collaboration |
27 Jan 2014 |
Changes |
PW-CF10 |
Public Works Contract for Early Collaboration |
29 Aug 2011 |
Changes |
PW-CF11 |
Terms and Maintenance Refurbishment Contract |
12 Jan 2013 |
Changes |
PW-CF11 |
Terms and Maintenance Refurbishment Contract |
30 Sept 2011 |
Changes |
PW-CF11 |
Standard Agreement |
30 Sept 2011 |
Changes |
PW-CF11 |
Appointment of Project Supervisor |
30 Sept 2011 |
Changes |
PW-CF11 |
Employer Note |
30 Sept 2011 |
Changes |
PW-CF11 |
Model Form |
30 Sept 2011 |
Changes |
PW-CF11 |
Schedule |
30 Sept 2011 |
Changes |
PW-CF11 |
Rates of Pay – Conditions of Employment |
30 Sept 2011 |
Changes |
PW-CF1 |
Appendix 7 & 8 |
04 Nov 2009 |
Changes |
PW-CF2 |
Appendix 7 & 8 |
04 Nov 2009 |
Changes |
PW-CF3 |
Appendix 7 & 8 |
04 Nov 2009 |
Changes |
PW-CF4 |
Appendix 7 & 8 |
04 Nov 2009 |
Changes |
PW-CF6 |
Appointment of a Project Supervisor |
04 Nov 2009 |
Changes |
PW-CF7 |
Appointment of a Project Supervisor |
28 July 2009 |
Changes |
PW-CF8 |
Appointment of a Project Supervisor |
28 July 2009 |
Changes |
Model Forms – (MF) |
MF 1 |
Public Works contract Model forms |
30 Mar 2010 |
Changes |
MF 1 |
Public Works contract Model forms |
16 Mar 2010 |
Changes |
MF 1 |
Public Works contract Model forms |
30 Jan 2008 |
Changes |
MF1.2 |
Letter to Apparently Unsuccessful Tenderer |
28 Jul 2009 |
Changes |
MF 1.2(a) |
Unsuccessful Tenderer – Procurement Above EU Threshold |
26 Jul 2010 |
Changes |
MF 1.2(b) |
Unsuccessful Tenderer – Below EU Threshold – Cross-Border |
26 Jul 2010 |
Changes |
MF 1.2(c) |
Unsuccessful Tenderer – Below EU Threshold and no Cross-Border Interest |
26 Jul 2010 |
Changes |
MF 1.2(d) |
Successful Tenderer – Procurement Above EU Threshold |
16 May 2011 |
Changes |
MF 1.2(e) |
Successful Tenderer – Below EU Threshold – Cross Border Interest |
16 May 2011 |
Changes |
MF 1.2(f) |
Unsuccessful Candidate (at short-list/ pre-qualify stage) – Above Threshold where letter is issued at same time as letters to successful and unsuccessful tenderers – the Standstill Period Applies |
01 Nov 2010 |
Changes |
MF 1.2(g) |
Unsuccessful Candidate (at short-list/ pre-qualify stage) – Above Threshold where letter is issued before the Standstill Period |
01 Nov 2010 |
Changes |
MF 1.2(h) |
Unsuccessful Candidate (at short-list/ pre-qualify stage) – Below Threshold – Cross Border Interest |
01 Nov 2010 |
Changes |
MF 1.2(i) |
Letter of Disqualification to Successful Candidate |
01 Nov 2010 |
Changes |
MF 1.3 |
Letter of Intent – Below EU Threshold – No Cross Border Interest
|
26 Nov 2010 |
Changes |
MF1.3 |
Letter of Intent |
28 Jul 2009 |
Changes |
MF1.4 |
Letter of Acceptance |
28 Jul 2009 |
Awaiting Note |
MF1.4 |
Employers Instructions |
26 Nov 2010 |
Changes |
MF1.6 |
Model Form of Performance Bond |
17 Nov 2009 |
Changes |
MF1.6 |
Model Form of Performance Bond |
28 Jul 2009 |
Changes |
MF1.6 |
Model Form of Performance Bond |
30 Jan 2008 |
Awaiting Note |
MF1.9 |
Novation Agreement |
30 Aug 2009 |
Changes |
MF1.10 |
Appointment of Project Supervisor |
30 July 2013 |
Changes |
MF1.12 |
Collateral Warranty |
28 Jul 2009 |
Changes |
MF1.13 |
Rates of Pay and Conditions of Employment Certificate |
27 Nov 2009 |
Changes |
Arbitration Rules – (AR) |
AR |
Arbitration Rules |
24 Sept 2014 |
Changes |
AR |
Arbitration Rules |
28 July 2009 |
Changes |
AR |
Arbitration Rules |
30 Jan 2008 |
Changes |
Weather Events – (WE1.0) |
WE 1.0 |
Weather Events WE 1.0 |
28 July 2009 |
Changes 22/01/19 |
Invitations To Tender (Works) – (ITTW) |
ITTW1 |
Instruction to Tender for Works, Restricted Procedure |
23 April 2013 |
Changes |
ITTW1 |
Instruction to Tender for Works, Restricted Procedure |
10 Aug 2011 |
Changes |
ITTW1 |
Invitation to Tender, Restricted Procedure |
18 Jul 2011 |
Changes |
ITTW1 |
Note to Employer, Restricted Procedure |
01 Mar 2010 |
Changes |
ITTW1 |
Instruction to Tender for Works, Restricted Procedure |
19 Jul 2011 |
Changes |
ITTW1 |
Instruction to Tender for Works, Restricted Procedure |
10 Feb 2011 |
Changes |
ITTW1 |
Invitation to Tender for Works, Restricted Procedure |
16 Apr 2010 |
Changes |
ITTW1 |
Instruction to Tender for Works, Restricted Procedure |
8 Oct 2010 |
Changes |
ITTW1 |
Instruction to Tender for Works, Restricted Procedure |
16 Apr 2010 |
Changes |
ITTW1 |
Invitation to Tender for Works, Restricted Procedure |
04 Nov 2009 |
Changes |
ITTW1 |
Instruction to Tender for Works, Restricted Procedure |
04 Nov 2009 |
Changes |
ITTW1 |
Instruction to Tender for Works, Restricted Procedure |
28 Jul 2009 |
Changes |
ITTW1 |
Instruction to Tender for Works, Restricted Procedure |
01 Aug 2008 |
Changes |
ITTW2 |
Instruction to Tender for Works, Open Procedure |
23 April 2013 |
Changes |
ITTW2 |
Instruction to Tender for Works, Open Procedure |
10 Aug 2011 |
Changes |
ITTW2 |
Note to Employer, Open Procedure |
01 Mar 2010 |
Changes |
ITTW2 |
Instruction to Tender for Works, Open Procedure |
19 Jul 2011 |
Changes |
ITTW2 |
Instruction to Tender for Works, Open Procedure |
10 Feb 2011 |
Changes |
ITTW2 |
Invitation to Tender for Works, Open Procedure |
04 Nov 2009 |
Changes |
ITTW2 |
Instruction to Tender for Works, Open Procedure |
16 Apr 2010 |
Changes |
ITTW2 |
Instruction to Tender for Works, Open Procedure |
04 Nov 2009 |
Changes |
ITTW2 |
Instruction to Tender for Works, Open Procedure |
28 Jul 2009 |
Changes |
ITTW3 |
Invitation to Tender for Works, Investigation Works |
23 April 2013 |
Changes |
ITTW3 |
Invitation to Tender for Works, Investigation Works |
02 Feb 2011 |
Changes |
ITTW3 |
Note to Employer, Investigation Works |
02 Feb 2011 |
Changes |
ITTW3 |
Invitation to Tender for Works, Investigation Works |
4 Feb 2010 |
Changes |
ITTW3 |
Instruction to Tender for Works, Investigation Works |
4 Feb 2010 |
Changes |
ITTW4 |
Instruction to Tender for Works, Open Procedure, Short form of Contract |
23 April 2013 |
Changes |
ITTW4 |
Instruction to Tender for Works, Open Procedure, Short form of Contract |
07 October 2011 |
Changes |
ITTW5 |
Instruction to Tender for Works Contract |
23 April 2013 |
Changes |
ITTW6 |
ITTW – Term Maintenance and Refurbishment Works Contract – Restricted Procedure |
25 Oct 2011 |
Changes |
Tender & SCHEDULE (Works) – (FTS) |
FTS1 |
For Building Works designed by the Employer |
13 Jan 2014 |
Changes |
FTS1 |
For Building Works designed by the Employer |
01 May 2013 |
Changes |
FTS1 |
For Building Works designed by the Employer |
01 June 2012 |
Changes |
FTS1 |
For Building Works designed by the Employer |
28 July 2011 |
Changes |
FTS1 |
For Building Works designed by the Employer |
10 May 2011 |
Changes |
FTS1 |
For Building Works designed by the Employer |
30 Mar 2010 |
Changes |
FTS1 |
For Building Works designed by the Employer |
22 Dec 2009 |
Changes |
FTS1 |
For Building Works designed by the Employer |
04 Nov 2009 |
Changes |
FTS1 |
For Building Works designed by the Employer |
28 Jul 2009 |
Changes |
FTS2 |
For Building Works designed by the Contractor |
13 Jan 2014 |
Changes |
FTS2 |
For Building Works designed by the Contractor |
01 May 2013 |
Changes |
FTS2 |
For Building Works designed by the Contractor |
01 June 2012 |
Changes |
FTS2 |
For Building Works designed by the Contractor |
28 July 2011 |
Changes |
FTS2 |
For Building Works designed by the Contractor |
10 May 2011 |
Changes |
FTS2 |
For Building Works designed by the Contractor |
30 Mar 2010 |
Changes |
FTS2 |
For Building Works designed by the Contractor |
22 Dec 2009 |
Changes |
FTS2 |
For Building Works designed by the Contractor |
04 Nov 2009 |
Changes |
FTS2 |
For Building Works designed by the Contractor |
28 Jul 2009 |
Changes |
FTS3 |
For Civil Engineering Works designed by the Employer |
13 Jan 2014 |
Changes |
FTS3 |
For Civil Engineering Works designed by the Employer |
01 May 2013 |
Changes |
FTS3 |
For Civil Engineering Works designed by the Employer |
01 June 2012 |
Changes |
FTS3 |
For Civil Engineering Works designed by the Employer |
07 October 2011 |
Changes |
FTS3 |
For Civil Engineering Works designed by the Employer |
28 Jul 2011 |
Changes |
FTS3 |
For Civil Engineering Works designed by the Employer |
10 May 2011 |
Changes |
FTS3 |
For Civil Engineering Works designed by the Employer |
30 Mar 2010 |
Changes |
FTS3 |
For Civil Engineering Works designed by the Employer |
22 Dec 2009 |
Changes |
FTS3 |
For Civil Engineering Works designed by the Employer |
04 Nov 2009 |
Changes |
FTS3 |
For Civil Engineering Works designed by the Employer |
28 Jul 2009 |
Changes |
FTS4 |
For Civil Engineering Works designed by the Contractor |
13 Jan 2014 |
Changes |
FTS4 |
For Civil Engineering Works designed by the Contractor |
01 May 2013 |
Changes |
FTS4 |
For Civil engineering Works designed by the Contractor |
01 June 2012 |
Changes |
FTS4 |
For Civil Engineering Works designed by the Contractor |
07 October 2011 |
Changes |
FTS4 |
For Civil Engineering Works designed by the Contractor |
28 Jul 2011 |
Changes |
FTS4 |
For Civil Engineering Works designed by the Contractor |
10 May 2011 |
Changes |
FTS4 |
For Civil Engineering Works designed by the Contractor |
30 Mar 2010 |
Changes |
FTS4 |
For Civil Engineering Works designed by the Contractor |
20 Mar 2010 |
Changes |
FTS4 |
For Civil Engineering Works designed by the Contractor |
22 Dec 2009 |
Changes |
FTS4 |
For Civil Engineering Works designed by the Contractor |
04 Nov 2009 |
Changes |
FTS4 |
For Civil Engineering Works designed by the Contractor |
28 Jul 2009 |
Changes |
FTS5 |
Public Works Contract |
13 Jan 2014 |
Changes |
FTS5 |
Public Works Contract |
18 July 2013 |
Changes |
FTS5 |
Public Works Contract |
01 May 2013 |
Changes |
FTS5 |
Public Works Contract |
01 June 2012 |
Changes |
FTS5 |
Public Works Contract |
08 August 2011 |
Changes |
FTS5 |
Public Works Contract |
28 Jul 2011 |
Changes |
FTS5 |
Public Works Contract |
30 Mar 2010 |
Changes |
FTS5 |
Public Works Contract |
22 Dec 2009 |
Changes |
FTS5 |
Public Works Contract |
04 Nov 2009 |
Changes |
FTS5 |
Public Works Contract |
28 Jul 2009 |
Changes |
FTS6 |
Form of Tender and SCHEDULE for Short Form Contract |
08 August 2011 |
Changes |
FTS6 |
Form of Tender and SCHEDULE for Short Form Contract |
01 Jun 2011 |
Changes |
FTS6 |
Form of Tender and SCHEDULE for Short Form Contract |
04 Nov 2009 |
Changes |
FTS6 |
Form of Tender and SCHEDULE for Short Form Contract |
28 Jul 2009 |
Changes |
FTS6 |
Form of Tender and SCHEDULE for Short Form Contract |
30 Oct 2008 |
Changes |
FTS7 |
Public Works Investigation Contract |
01 May 2013 |
Changes |
FTS7 |
Public Works Investigation Contract |
01 June 2012 |
Changes |
FTS7 |
Public Works Investigation Contract |
03 October 2011 |
Changes |
FTS7 |
Public Works Investigation Contract |
01 Jun 2011 |
Changes |
FTS7 |
Public Works Investigation Contract |
28 Jul 2009 |
Changes |
FTS8 |
Public Works Short Form of Investigation Contract |
03 October 2011 |
Changes |
FTS8 |
Public Works Short Form of Investigation Contract |
01 Jun 2011 |
Changes |
FTS8 |
Public Works Short Form of Investigation Contract |
28 Jul 2009 |
Changes |
FTS9 |
Form of Tender and Schedule, Consultancy Services (Technical) |
18 Mar 2011 |
Changes |
FTS10 |
Form of Tender and Schedule, Archaeology Services |
26 Feb 2013 |
Changes |
FTS11 |
Public Works Contract for Early Collaboration |
01 June 2012 |
Changes |
FTS11 |
Public Works Contract for Early Collaboration |
29 August 2011 |
Changes |
FTS12 |
Term Maintenance and Refurbishment Contract |
24 Nov 2014 |
Changes |
FTS12 |
Term Maintenance and Refurbishment Contract |
12 Dec 2013 |
Changes |
FTS12 |
Term Maintenance and Refurbishment Contract |
30 Sept 2011 |
Changes |